SZ09 was built for China Telecom & opened April 2016 with 12 separate areas.
SZ09 was built for China Telecom & opened April 2016 with 12 separate areas.
Location: ShenZhen
Floor Size (m²): 4,000
Total Cabinets: 2,056
Redundancy Mode | Capacity | Device Number | Remarks | |
Electric Power | 2N | 20000KVA | 2 | Double circuit power supply |
Diesel Generator | N | 8800KVA | 4 | Local Brand, for 8 hrs. |
UPS | N+1 | 9100KVA | EATON | |
Accumulator | 150AH/ Unit | 3 | C&D, for 15 min. | |
Chiller | N+1 | 1000TON/ Unit | 3 | York |
Cooling Tower | N+1 | 3 | MARLEY | |
CRAC | N+1 | ITEAQ |