SZ08 opened October 2016 with 12 separate areas.
SZ08 opened October 2016 with 12 separate areas.
Location: ShenZhen
Floor Size (m²): 4,000
Total Cabinets: 2,020
Redundancy Mode | Capacity | Device Number | Remarks | |
Electric Power | 2N | 20000KVA | 2 | Double circuit power supply |
Diesel Generator | N+1 | 8800KVA | 4 | YICHANG, for 24 hrs. |
UPS | N+1 | 500KVA/ Unit | 21 | SCHNEIDER |
Accumulator | 150AH/ Unit | 3 | C&D, for 15 min. | |
Chiller | N+1 | 1000TON/ Unit | 3 | YORK, water separator |
Cooling Tower | N+1 | 3 | MARLEY | |
CRAC | N+1 | 98 | ITEAQ |